• Skip to main content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    You are here:

    • Home
    • Consolidated Wastewater Treatment Plant - COMPLETED

    Photos

    Outfall Tie-In 2021-10-27
    previous next
    • The lower approximately 50% of the concrete barrels that form the main structure of outfall manhole SMH 275 have been installed. Within them is the black HDPE “Weholite” liner. The excavator is assisting with the adjustment of the 900mm HDPE outfall to allow the connection to SMH 275. • The land-portion of the 900mm HDPE Outfall Pipe was installed and connected to SMH 275 following s successful hydrostatic pressure test, but has yet to be backfilled. At the top of the picture, the 900mm HDPE outfall enters the concrete encased section that crosses under the WFP Log-Dump. • Once SMH 275 and the upstream outfall connections have been completed, the ground elevation in the area will be brought up to the top of SMH 275 (top of the “Weholite” liner) with imported 75mm minus engineered fill.
    2022-07-19 - CWWTP Outfall In-Shore End.jpg
    2022-07-19 - CWWTP Outfall Off-Shore End.jpg
    2022-07-22_CWWTP_outfall_completion(2).jpg
    2022-07-22_CWWTP_outfall_completion.jpg
    CWWTP_jul-30, 2022.PNG
    plant_site_may-4-2023_graham_photos.JPG
    CWWTP Process Building - May 26, 2022_Page_3.png
    Process Building Construction 2021-10-27
    Outfall Tie-In 2021-10-27
    Bioreactor Complex 2021-10-27
    Tower Crane
    Conceptual Design: Natural Integration Theme
    Outflow
    Current location of the Westview water treatment plant - to be decommissioned
    Current location of the Wildwood lagoon - to be decommissioned
    Current Townsite Wastewater Treatment Plant - to be decommissioned
    Wastewater Treatment Plant Process
    Wastewater to water - Powell River's current wastewater treatment