• The lower approximately 50% of the concrete barrels that form the main structure of outfall manhole SMH 275 have been installed. Within them is the black HDPE “Weholite” liner. The excavator is assisting with the adjustment of the 900mm HDPE outfall to allow the connection to SMH 275. • The land-portion of the 900mm HDPE Outfall Pipe was installed and connected to SMH 275 following s successful hydrostatic pressure test, but has yet to be backfilled. At the top of the picture, the 900mm HDPE outfall enters the concrete encased section that crosses under the WFP Log-Dump. • Once SMH 275 and the upstream outfall connections have been completed, the ground elevation in the area will be brought up to the top of SMH 275 (top of the “Weholite” liner) with imported 75mm minus engineered fill.